Route 19 North and West are co-located sites on adjacent properties with shared access and parallel points of interconnection. The project sites required extensive earthwork, including several acres of grading to accommodate the single-axis tracker racking system and to establish stable foundations across varying terrain. Three engineered bioretention basins were constructed to effectively manage stormwater runoff, improve onsite drainage, and meet all state and local environmental compliance requirements.